- (Topic 7)
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production-
You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?
Correct Answer:A
HOTSPOT - (Topic 7)
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:A
HOTSPOT - (Topic 5)
You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:A
- (Topic 7)
A manufacturer uses Dynamics 365 Supply Chain Management.
The engineering department constantly revises product designs to stay current with the latest technology. The customer service department places orders lot the products but frequently adds a prototype product version that is not yet operational.
The manufacturer requites a solution that notifies customer service if a prototype version is selected on a sales order.
You need to configure the solution. What should you configure?
Correct Answer:C
HOTSPOT - (Topic 7)
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).
After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)
You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)
You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:A
DRAG DROP - (Topic 7)
A company uses the asset management module in Dynamics 365 Supply Chain Management.
A machine on the shop floor is noisy and emitting and odd smell. The shop floor manager must alert the repair team that the asset might require a repair, or a series of repairs, by one or more specialized repair technicians. All repair records must tie back to the initial investigation records in case of a safety audit.
You need to create components to initiate the process of tracking the requests.
Which three actions should you perform in sequence? To answer. More the appropriate actions from the list of actions to the answer to the answer area and arrange them in the correct order.
Solution:
Does this meet the goal?
Correct Answer:A